Wood Wharf - Canary Wharf Contractors

Reduce rework. Manage risk.
  • £190K – Annual cost savings
  • 36,000 – KG CO2 saved
  • 580 – Additional deliveries captured

Introduction

A mixed use, water side community development seeking FSC timber certification. To help the team keep track, they needed to digitise the flow of data on the project. Here is how they did it!

Canary Wharf Contractors is an industry leading firm that sets challenging goals in the pursuit of excellence. One of these goals is the internal requirement that all projects operated by Canary Wharf Contractors must be 100% FSC certified. Responsible sourcing is a corner stone of sustainable construction and the achievement of such a certification comes with certain obstacles.

The challenge

In order to achieve FSC certification, 100% of the timber that goes into the build must be FSC certified and the contractor must be able to provide evidence of this. If as much as one of the hundreds of timber deliveries to site is uncertified and slips through the cracks, the project will fail its certification and all that work will have been in vain. The Canary Wharf Contractors team are commitment to achieving this sustainability target, and will replace the uncertified timber even if it requires rework. The additional cost and time commitment had become a burden on the project team so they sought out a better way.

“By adopting the Qflow system we were able to achieve our FSC certification with ease and it saved us thousands of pounds in the process. We are delighted with what the team at Qflow have done for the Wood Wharf project”

– Andy Haigh, Senior Sustainability Manager, Canary Wharf Contractors

The Solution

To solve this issue, the Wood Wharf project team needed to be alerted if uncertified timber was delivered to site, and ensure that the correct documentation was available for FSC audits. Qflow stepped in and deployed its innovative data capture and analytics tool to solve this problem. This alerted the team to uncertified deliveries so that they could act to eliminate that risk. By keeping a constant eye on all deliveries, Qflow enabled the project to run smoothly and minimise delays and unnecessary costs due to required rework.

To read more about how Qflow did this, the technology used, and the many additional benefits that Canary Wharf Contractors experienced as a direct result of deploying Qflow, download the full case study.

Construction worker in orange safety jacket and blue helmet using a smartphone to scan or take a photo of a delivery document held by another person at a worksite.

Ready to see Qflow in action?

A 20-minute call to walk through the product on the parts that matter to your team.

News & Insights

Resources to build site better data.

Read insights, reports and practical guides on construction waste, carbon, materials, compliance and the changing role of data in the built environment.

Case Study
09.06.26
Collect BREEAM evidence while the project is live.
Qflow captures materials, waste, utility and carbon data on site as work happens, building a clear BREEAM evidence trail before gaps appear.
Case Study
31.03.26
BW Scales Project Capacity 85% with Automated Delivery Data
How Qflow helped one of London’s leading workplace contractors increase efficiency and reduce costs.
Case Study
02.10.25
Balfour Beatty
Balfour Beatty, one of the UK’s largest infrastructure firms, is deeply committed to driving sustainable outcomes across its operations.
A man and a woman sit facing each other in an office setting, reviewing data on three monitors displaying colorful charts and graphs related to deliveries, waste, and carbon emissions.

Turn site activity into trusted data.

Book a demo to see how Qflow captures, checks 
and reports your material, waste and carbon data.