Case Study
10 min read

UWE Bristol - John Perkins

Reduce rework. Manage risk.

UWE are an important client for John Perkins Construction and are always interested in ways their supply chain can innovate and demonstrate sustainability and quality initiatives.

Introduction

John Perkins Construction (JPC) deployed Qflow on the UWE Bristol project with the purpose of delivering SKA rating and assuring material specifications were met.

JPC used the UWE Bristol pilot to trial Qflow and understand the value that could be added by deploying the tool across the wider business on an enterprise agreement.

  • 150K – Potential installation risk avoided
  • SKA – Rating Supported

Collaboration and performance

JPC are known for their collaborative working style, ensuring their clients get the best value for money. Qflow has helped equip JPC with granular and transparent data from their supply chain. Having Qflow verify the data in the background to ensure the specifications required are compliant gives the team piece of mind and confidence that what has been designed has been built.

"Its beauty is its simplicity"

– Rupert Perkins, Managing Director, John Perkins Construction

The Solution

John Perkins Construction are committed to matching the UK’s 80% reduction in Greenhouse Gases (GHG) emissions by 2050. Qflow is supporting JPC to measure and report on their Scope 1 & 3 emissions, so that they can continue to drive down their impact on climate change.

Construction worker in orange safety jacket and blue helmet using a smartphone to scan or take a photo of a delivery document held by another person at a worksite.

Ready to see Qflow in action?

A 20-minute call to walk through the product on the parts that matter to your team.

News & Insights

Resources to build site better data.

Read insights, reports and practical guides on construction waste, carbon, materials, compliance and the changing role of data in the built environment.

Case Study
09.06.26
Collect BREEAM evidence while the project is live.
Qflow captures materials, waste, utility and carbon data on site as work happens, building a clear BREEAM evidence trail before gaps appear.
Case Study
31.03.26
BW Scales Project Capacity 85% with Automated Delivery Data
How Qflow helped one of London’s leading workplace contractors increase efficiency and reduce costs.
Case Study
02.10.25
Balfour Beatty
Balfour Beatty, one of the UK’s largest infrastructure firms, is deeply committed to driving sustainable outcomes across its operations.
A man and a woman sit facing each other in an office setting, reviewing data on three monitors displaying colorful charts and graphs related to deliveries, waste, and carbon emissions.

Turn site activity into trusted data.

Book a demo to see how Qflow captures, checks 
and reports your material, waste and carbon data.