Case Study
10 min read

Oxfordshire Highways - Skanska UK

Reduce rework. Manage risk.
  • £295K – Added value
  • 70% – improved data capture
  • 400 – Notifications sent

Introduction

A £350 million highways maintenance project in South East England deployed Qflow as a waste tracking system to track waste across 5300 miles of roadworks.

Construction is one of the biggest contributors to waste in the UK today with approximately 32% of all waste to landfill originating from construction. Not only is this waste having an impact on our climate, but it also impact people’s health and safety.

Skanska UK, one of the industry’s leading pioneers in sustainability, is constantly on the look out for better ways to manage their works. The company was looking for a better and more accurate way to establish a dataset of their waste movements on a highway maintenance project in Oxfordshire. This £350 million framework includes maintenance of 2800 miles of carriageway, 2500 miles of footway, and 2900 structures. Due to its size and nature, the project produces a substantial amount of waste.

The challenge

Under the Waste Duty of Care regulations, which are regulated by the Environment Agency, waste movements from origin to disposal must be carried out by licensed organisations and accurately documented using Waste Transfer Notes or Hazardous Waste Consignment Notes. The scale of the framework made handling this much documentation a challenge.

“Qflow has provided us with more accurate waste data, enabling our team to deliver better forecasts of waste transfers, while reducing likelihood of administrative errors.”

– Oliver Beech, Sustainability Manager, Skanska UK

The solution

Qflow integrated seamlessly with the existing workflow, making it easy for the operatives to start capturing waste data at the push of a button. All that was required of them was that they open up the Qflow smartphone app, snap a picture of a Waste Transfer Note or Hazardous Waste Consignment Note, and hit save. We handled the rest.

To read more about the project and the technology that helped Skanska overcome these challenges and generate conservable added financial value, please feel free to download the full case study below!

Construction worker in orange safety jacket and blue helmet using a smartphone to scan or take a photo of a delivery document held by another person at a worksite.

Ready to see Qflow in action?

A 20-minute call to walk through the product on the parts that matter to your team.

News & Insights

Resources to build site better data.

Read insights, reports and practical guides on construction waste, carbon, materials, compliance and the changing role of data in the built environment.

Case Study
09.06.26
Collect BREEAM evidence while the project is live.
Qflow captures materials, waste, utility and carbon data on site as work happens, building a clear BREEAM evidence trail before gaps appear.
Case Study
31.03.26
BW Scales Project Capacity 85% with Automated Delivery Data
How Qflow helped one of London’s leading workplace contractors increase efficiency and reduce costs.
Case Study
02.10.25
Balfour Beatty
Balfour Beatty, one of the UK’s largest infrastructure firms, is deeply committed to driving sustainable outcomes across its operations.
A man and a woman sit facing each other in an office setting, reviewing data on three monitors displaying colorful charts and graphs related to deliveries, waste, and carbon emissions.

Turn site activity into trusted data.

Book a demo to see how Qflow captures, checks 
and reports your material, waste and carbon data.