Case Study
10 min read

Grosvenor

Reduce rework. Manage risk.

Grosvenor is an international organisation whose activities span urban property, food and ag-tech, rural estate management and support for philanthropic initiatives.

With a track record of over 340 years, Grosvenor works to improve urban property and places in many of the world’s leading cities, promoting sustainability within the built environment and enhancing the wellbeing of customers and communities.

Introduction

Grosvenor is deploying Qflow across their portfolio of projects ranging from large estate developments such as the South Molton, to small development projects including refurbishments and fit-out projects.

Alongside being an active Qflow user, Grosvenor have invested in Qflow as part of the recent Series A investment round.

  • 98% – of waste diverted from landfill
  • <6.5tn – tonnes of waste produced per 100m2
  • 3.5 days – of work saved per project

The Challenge

Before deploying Qflow the Grosvenor sustainability team faced multiple challenges regarding data capture and ensuring that sustainability was a key focus for their supply chain.

”Qflow allows us to report on real-time construction site material delivery and waste. This means we not only get greater accuracy but also live accountability in sustainably reporting.Qflow provides us with a neat solution to tackle large and complicated construction data”

The Solution

Qflow has given Grosvenor access to more granular details on materials used and the waste produced within their construction projects and has also reduced the burden on suppliers to manually supply data.

This increased visibility of materials and waste data helps the Grosvenor team to improve confidence that materials are being responsibly sourced, that waste is being managed correctly, and that supply chain partners are doing the right thing.

Qflow plays a key role in fostering innovation within Grosvenor’s supply chain and enhancing the skill set of its partners. By leveraging Qflow, Grosvenor gains the capability to utilise data effectively, empowering them to make informed and strategic decisions.

Download the full case study below to learn more about how BW achieved this and the plans for future sustainable developments!

Construction worker in orange safety jacket and blue helmet using a smartphone to scan or take a photo of a delivery document held by another person at a worksite.

Ready to see Qflow in action?

A 20-minute call to walk through the product on the parts that matter to your team.

News & Insights

Resources to build site better data.

Read insights, reports and practical guides on construction waste, carbon, materials, compliance and the changing role of data in the built environment.

Case Study
09.06.26
Collect BREEAM evidence while the project is live.
Qflow captures materials, waste, utility and carbon data on site as work happens, building a clear BREEAM evidence trail before gaps appear.
Case Study
31.03.26
BW Scales Project Capacity 85% with Automated Delivery Data
How Qflow helped one of London’s leading workplace contractors increase efficiency and reduce costs.
Case Study
02.10.25
Balfour Beatty
Balfour Beatty, one of the UK’s largest infrastructure firms, is deeply committed to driving sustainable outcomes across its operations.
A man and a woman sit facing each other in an office setting, reviewing data on three monitors displaying colorful charts and graphs related to deliveries, waste, and carbon emissions.

Turn site activity into trusted data.

Book a demo to see how Qflow captures, checks 
and reports your material, waste and carbon data.