Case Study
10 min read

BW Scales Project Capacity 85% with Automated Delivery Data

Reduce rework. Manage risk.

How Qflow helped one of London’s leading workplace contractors increase efficiency and reduce costs.

BW: Workplace Experts (BW) delivers high-quality office fit-outs and refurbishments across London and beyond. With a portfolio spanning projects for London Business School, Skyscanner and Virgin O2, the company has built its reputation on its “Defect Free” standard; projects delivered on time, with no snags and best-in-class customer experience.

As BW grew from a £70 million to a £325 million business, the team faced a critical operational challenge. Manual processes for tracking deliveries and materials were creating a significant margin for error, consuming valuable time and limiting the company’s ability to scale without expanding headcount.

The Challenge

BW’s rapid growth highlighted the need for more accurate, scalable data management. Manual processes that had served the company well were holding the team back as project numbers and complexity increased.

“We’ve gone from having thousands of conversations that Qflow now does automatically with one scan of a delivery note,”explains Tomas Hollingsworth. “There’s so much margin for error when you’re relying on multiple people retrospectively talking about hundreds of product deliveries in Central London.”

The operational impact was multifaceted. Quality verification for key materials like FSC timber relied on trust rather than systematic checks. Delivery cost visibility was limited, making it difficult to identify opportunities for consolidation. Site teams lacked real-time data to monitor installation progress or prevent overcrowding in logistically tight, Central London environments. Skilled team members spent their time chasing data, rather than analysing it to identify cost savings and process improvements.

Why Qflow?

BW chose Qflow approximately two years ago for its ability to replace manual verification with automated, real-time data capture that would improve accuracy, reduce costs and enable scalable growth.

The BW team led a comprehensive rollout, which included a roadshow supported by Qflow to demonstrate the system’s simplicity to logistics managers on site. The focus on reducing the paperwork burden made deployment straightforward. BW emphasised real-time adoption from day one, with teams scanning delivery notes as they arrived for immediate data capture and live notifications.

The partnership also established an iterative feedback loop, enabling Qflow to refine usability based on real-world insights from the BW team.

How They Use Qflow

Qflow’s mobile platform transformed BW’s operations from reactive to proactive, delivering improvements across quality, cost control and operational efficiency:

  • Single-scan verification: Every delivery note is captured and verified with one photograph, replacing thousands of manual conversations and dramatically reducing margin for error.
  • Real-time material alerts: Material specifications, such as FSC timber certification are now verified on arrival, ensuring quality and preventing non-compliant materials from entering sites.
  • Time-restricted delivery monitoring: The platform tracks deliveries against loading bay time restrictions, helping BW avoid financial penalties in Central London.
  • Long-term trend analysis: Historical data identifies patterns, enabling BW to consolidate unnecessary deliveries and reduce both delivery costs and carbon impact.
  • Automated compliance checks: The system verifies waste licensing against proper authorities, providing systematic tracking without manual effort.
“We still have the same number of managers that we had when we were managing maybe 20 projects at a time. Right now, we’re managing 37 projects. That number hasn’t increased. I think that’s a testament to the product.”

Tomas Hollingsworth | Director of Technology | BW: Workplace Experts

The Results: 85% Increase in Capacity

The impact has been transformational. By digitising 14,579 tickets, BW now manages 37 major projects with the same team that previously handled 20, an 85% increase in capacity with no additional headcount. This achievement is even more impressive, given that project complexity increased significantly during this period.

The margin for error has fallen dramatically. Real-time verification replaced trust-based processes with systematic checks, flagging issues as they happen, rather than weeks later. The team has reclaimed an estimated 30 days of time for strategic work, allowing them to focus on identifying cost savings and process improvements rather than spending valuable time chasing spreadsheet data.

Visibility into delivery patterns has delivered unexpected financial benefits. BW can now identify suppliers making multiple daily or weekly deliveries, consolidating these to reduce delivery charges per project. The platform also helps avoid financial penalties by monitoring time-restricted loading bays in Central London. With potential compliance costs of £46,083 now successfully avoided.

The data serves the wider organisation beyond the original use case. Finance teams use it to manage supplier costs and reduce delivery charges. Quality teams get real-time material verification. Site teams can mitigate health and safety risks. While commercial teams can monitor installation progress to de-risk project timelines.

As an added benefit, the platform delivers strong sustainability credentials. Verified, real-time tracking provides demonstrable proof of environmental performance, achieving a 99.75% diversion from landfill rate and preventing 171,028 tonnes of material from ending up in landfill. Put another way, that’s equivalent to 1,140 blue whales, or 28,505 elephants or 950 jumbo jets. (Pick your favourite metric.) This helps combat ‘greenwashing’ concerns during tender processes.

Scaling the Success

BW views the delivery and materials data as a competitive advantage for project delivery and quality. The ability to demonstrate accuracy, reduce errors, save significant sums and manage complex projects efficiently all combine to strengthen its market position. While the verified and impressive sustainability savings provides an additional edge.

Hollingsworth concludes, “We’re not constantly paying that delivery charge any more, because Qflow replaced thousands of conversations with one scan of a delivery note. That is, in essence, the reason we looked at Qflow (…) We can now see when suppliers are making multiple deliveries and consolidate them. That’s been a real step-change for us.”

Construction worker in orange safety jacket and blue helmet using a smartphone to scan or take a photo of a delivery document held by another person at a worksite.

Ready to see Qflow in action?

A 20-minute call to walk through the product on the parts that matter to your team.

News & Insights

Resources to build site better data.

Read insights, reports and practical guides on construction waste, carbon, materials, compliance and the changing role of data in the built environment.

Case Study
09.06.26
Collect BREEAM evidence while the project is live.
Qflow captures materials, waste, utility and carbon data on site as work happens, building a clear BREEAM evidence trail before gaps appear.
Case Study
31.03.26
BW Scales Project Capacity 85% with Automated Delivery Data
How Qflow helped one of London’s leading workplace contractors increase efficiency and reduce costs.
Case Study
02.10.25
Balfour Beatty
Balfour Beatty, one of the UK’s largest infrastructure firms, is deeply committed to driving sustainable outcomes across its operations.
A man and a woman sit facing each other in an office setting, reviewing data on three monitors displaying colorful charts and graphs related to deliveries, waste, and carbon emissions.

Turn site activity into trusted data.

Book a demo to see how Qflow captures, checks 
and reports your material, waste and carbon data.